1 / 2

AGS/Booster Status

Haixin Huang. April 1 , 2014 Time Meeting. AGS/Booster Status. Status. Siemens: Switch to it on Thursday behind a RHIC store (4 hours). The AGS Au intensity at extraction is high: ~2*10 9 /bunch. Need new scheme or more from EBIS to significantly increase the bunch intensity.

clove
Télécharger la présentation

AGS/Booster Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HaixinHuang April 1, 2014 Time Meeting AGS/Booster Status

  2. Status • Siemens: Switch to it on Thursday behind a RHIC store (4 hours). • The AGS Au intensity at extraction is high: ~2*109/bunch. Need new scheme or more from EBIS to significantly increase the bunch intensity. • NRO run done last week. NSRL run starts this week, and runs till May 16. • AGS and Booster pp setup starts next Monday, April 7. The goals are reaching high intensity required for next run and emittance preservation. Cold snake repair tomorrow. If not ready for Monday, instrumentation setup can be done without cold snake on. • D5 eIPM gas leak work will be done on Wednesday. The old IPM should work after that (shared gas leak system). D15 eIPM is scheduled to be installed on April 16. Haixin Huang

More Related