This week’s maintenance activities include a leak repair of NOVAC lasting around 6 hours, prompting a Maintenance Day declaration for RHIC, with access limited to AGS. Various areas of RHIC are currently opened while others remain on Controlled Access (CA). Key efforts in RHIC focus on RMMPS, stochastic cooling equipment, RF conditioning, and preparation for the High Energy Run. Significant inspections, repairs, and maintenance are underway in AGS, including polarimeter work and vacuum leak checks. Please note the specific access schedules for experimental areas.
E N D
Maintenance this week • Initiated by PHENIX access. • NOVAC leak repair ~6hrs • Maintenance Day declared for RHIC. • 8 hours. • Many areas of RHIC opened, some remain on CA. • No Booster access • AGS Access 0800-1400hrs.
Major RHIC Effort: • RMMPS • Stochastic cooling equipment • 56MHz, CeCPoP. • Prep for High Energy Run. • RF Conditioning. • AC Dipole for Blue. • Vacuum, Instrumentation and Power Supply repair and maintenance.
AGS • Repair, Maintenance and inspection. • C15 polarimeter work. • Vacuum leak check. • D15 welding. • Westinghouse maintenance. • Siemens work?
Access Schedule • RHIC Experimental Access: • 0800-1700hrs. • RHIC ring Access: • 0830-1600hrs. • IR 4 Access 0830-1230hrs. • RF conditioning 1230-1700hrs.