html5-img
1 / 1

INPUTS

ICD ▪ Draft CDD Approved Material Solution Exit Criteria T&E Strategy Support & Maintenance Concepts & Technologies ▪ SEP ▪ TDS. Interpret User Needs, Refine System Performance Specs & Environmental Constraints. Trades. Develop System Functional Specs & Verification Plan

len
Télécharger la présentation

INPUTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICD ▪ Draft CDD • Approved Material Solution • Exit Criteria • T&E Strategy • Support & Maintenance Concepts & Technologies • ▪ SEP ▪ TDS Interpret User Needs, Refine System Performance Specs & Environmental Constraints Trades Develop System Functional Specs & Verification Plan To Evolve System Functional Baseline Interpret User Needs, Analyze Operational Capabilities & Environmental Constraints Trades Demo/Validate System Concepts & Tech Maturity Versus Defined User Needs Trades Evolve Functional Performance Specs into CI Functional (Design to) Specs and CI Verification Plan Develop Sys Perf (& Constraints) Spec & Enabling Critical Tech & Prototypes Verification Plan Demo/Model System Versus the System Performance Spec PDR Demo System & Prototype Functionality Versus Plan Develop Functional Definitions for Enabling/Critical Tech/Prototypes & Assoc Verification Plan -Sys Allocated Baseline -PDR Report -Live- Fire T&E Waiver request (if appropriate) -SEP -PESHE -TRA -TEMP - PPP -Risk Assessment ▪Validated Sys Support & Maint Objectives & Requirements -NEPA Compliance Schedule (as required) -Inputs to: Info Support Plan, Acquisition Strategy, CDD, Sys Threat Assessment, Affordability Assessment , Cost & Manpower Est. Plan, & KPPs/KSAs Decompose Functional Definitions into Critical Component Definition & Tech Verification Plan Demo Enabling/ Critical Technology Components Versus Plan Design/Develop System Concepts, i.e., Enabling/Critical Technologies, Update Constraints & Cost/Risk Drivers Technology Development Phase Milestone A Milestone B (Technology Maturation, Prototyping, & Integrated System Design) INPUTS SRR SFR OUTPUTS PPDR PCDR

More Related