1 / 7

CDM - Performance Indicators

CDM - Performance Indicators. KPI - Airport Benefits and Performance Indicators. Improve Punctuality . Measure occupancy duration AOBT - AIBT Measure estimates occupancy in /out block EIBT/EOBT and EIBT/ESDT. Evaluate Turn around time . Decrease S&G changes.

lori
Télécharger la présentation

CDM - Performance Indicators

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CDM - Performance Indicators

  2. KPI - Airport Benefits and Performance Indicators • Improve Punctuality • Measure occupancy duration AOBT - AIBT • Measure estimates occupancy in /out block EIBT/EOBT and EIBT/ESDT • Evaluate Turn around time • Decrease S&G changes • Measure the number of changes in the S&G allocation • Measure and compare period between EOBT-EIBT and ESDT-EIBT • Evaluate Security Check Period • Measure ESCP (start and end) • Compare ESCP and ASCP • Passengers Information • Change ETD information by ESDT information • Give ESCP (Start and End) information • Optimise use of Available Capacity ( S&G, Checking pax and bax ) • Optimize S&G occupancy • Count flights request with earlier off block time (for waiting bay) to the TWR • Count flights with earlier off block time (accepted by the TWR) • Optimize turn around operations • Count number of ESCP End after estimated boarding time (~TOBT -30’) • Increase Efficiency • Adapt S&G allocation to : • - Airline preferences • - Handlers preferences • Measure satisfaction rate: airline, handlers • Checking distinguishes • luggage and fret • Pax selected by destination • Count number of eliminated luggage • Count the containers number by destination • Estimates Measurements done at different milestones • Comparison prior to CDM and with CDM

  3. KPI - Airport Benefits and Performance Indicators • Estimates Measurements done at different milestones • Comparison prior to CDM and with CDM • Reduce Environmental Nuisance • Reduce noise on ground • Reduce emission from engines • Measure taxi-in and taxi-out periods by runways configuration • Improve Safety • Reduce Movements Number • (trucks, bus,…) • Measure number of last S&G changes due to overlapping

  4. KPI - Handlers Benefits and Performance Indicators • Improve Punctuality • Improve Turn-round predictability • Measure : turn-round period (ETAP) • : start and end handling operations (AGHT / ARDT) • : difference between TOBT and ARDT • Optimize Turn Around • Check real TA against schedule TA (ATAP and STAP) • Measure : gaps between STAP and TTAP (=AIBT to ARDT). • : number of Boarding alarms (Milestones approach) • : number of TOBT updates between EOBT -30’ and AOBT • Measure delay : between EIBT and AIBT at ELDT -30’ • : due to late equipment (e.g. buses, push-back tractors, steps etc) • : due to late personnel • Reduce delays due to late equipment • and personnel. • Optimise use of Resources ( Refuelling, Push-back, De-icing ) • Optimise data quality provided to • services • Measure impact on TOBT due to : • fuelling, push-back, de-icing • unloading baggage of missed passengers • too many handbags on board • sorting of transit baggage • Increase Efficiency • Airline preferences, SLA.. • Measure : respect of the prioritisation given by airline • : number of later flights due to later passengers • Improve Safety • Reduce movements number • Measure number of flights : without passengers numbers (bus), without slot update (staff), • Measure request time for fuelling, push back, de-icing against EOBT -30’ • Estimates Measurements done at different milestones • Comparison prior to CDM and with CDM

  5. KPI - Airlines Benefits and Performance Indicators • Improve Punctuality • Measure Estimated Off Block Time (EOBT) • Measure Target Off Block Time (TOBT) • Measure Period between the Start Boarding Time and TOBT • Measure Pilot Star-up Request Time (ASRT) • Establish pre-departure sequence • Optimize departure sequence • Measure Pilot reactivity: comparison with TOBT and ASRT, ASDT and AOBT • Measure number of TOBT updates between EOBT -30’ and AOBT • Measure TOBT accuracy: comparison with TOBT and AOBT between EOBT -30’ and AOBT • Optimize Turn Around • Measure period between all doors closed and TOBT • Measure contributing delays, based on IATA standard delay coding. • Establish the link (REG) between arrival and departure leg • Bus, S&G • Measure number of passengers by destination at ELDT -30’ • Measure number of changes in the next destination between ELDT -30’ and AIBT • Turn Around, Delay • Measure the Turn Around Period ASRT - AIBT and the estimated EOBT - EIBT at ELDT -30’ • Measure the difference between inbound flight delay and outbound flight delay. • Estimates Measurements done at different milestones • Comparison prior to CDM and with CDM • Optimise use of Resources ( Bus, S&G, slots airport and ATFM ) • Slot Compliance • Measure number of EOBT updates by flight between EOBT -30’ and AOBT • Measure number of flights out of the slot window at TOBT-20’ • Increase Efficiency • Improve Safety

  6. KPI - TWR Benefits and Performance Indicators • Improve Punctuality • Measure Estimated first Clearance Delivery Time (Start-Up or ESDT) • Measure Estimated Taxi Out Period per flight (EXOP:period between block and holding point) • Measure Estimated and Target Take-Off Time (ETOT / TTOT) • Establish pre-departure sequence • Optimize departure sequence • Comparison with ESDT and ASDT, EXOP and AXOP, TTOT and ATOT • Measure the Reactivity between Request and Delivery clearance (ASDT and ASRT) • Establish arrival sequence • Measure Estimated Holding or Vectoring time • Measure Estimated Landing Time (ELDT) • Measure Estimated Taxi In Period per flight (EXIP) • Measure Estimated In Block Time (EIBT) • Optimize arrival sequence • Comparison with ELDT and ALDT, EXIP and AXIP, EIBT and AIBT • Optimise use of Resources ( runways, taxi ways, slots airport and ATFM ) • Optimize runway throughput • Measure movements number (landing and take-off) per hour vs declared capacity • Measurement average taxi in and out period, min and max • Changes number in the sequence after TOBT -20’ • Slot Compliance • Measure number of refused TOBT (not compliant with CTOT) • Percentage of missed slots (departing out of the CTOT window) • Estimates Measurements done at different milestones • Comparison prior to CDM and with CDM • Increase Efficiency • Earlier recovery after disruption • Measure time normal capacity recovery and cancelled regulation ( cancel slots ) • Measure time between cancelled regulation and re-start of normal operations • Impact on Safety • Minimize number of a/c moving • at the same time • Change capacity (increase) • Measure the optimised taxi period . (Less a/c taxiing at the same time greater is the • safety on ground) • Comparison with capacity change and numbers of incidents

  7. KPI - CFMU Benefits and Performance Indicators • Improve Punctuality • Comparison with ETOT and ATTOT and AATOT • Comparison with ATOT and ETOT, ATTOT, AATOT • DPIs Data Accuracy • ATFM Regulations • Measure number of airport regulations • Measure average duration of airport regulations • Measure percentage of regulated flights • Count the total ATFM delays : CTOT - ATTOT for all departure flights • Measure airport slot adherence : CTOT - ATOT for all departure flights • Total ATFM Delays • DPIs Stability • Count DPIs messages number by type ( 1, 2 and 3 ) for all departure flights • DPIs for each type of message measure time between last message sent and ATOT • Optimise use of Resources ( slots ) • Slot Compliance • Measure percentage of lost slots ( departing out of the CTOT window) • Slot Improvement • Count number of total improvement messages • Count regulated flights improved (by recomputed slot, by shift / by swap ) • Count minutes saved between the most penalised slot and the slot used for departure • Increase Efficiency • Faster Recovery • Measure time between declared capacity recovery and cancelled regulation ( cancel slots ) • Measure time between cancelled regulation and re-start of normal operations • Measures are done at different milestones by airport / by year • Comparison prior CDM and with CDM PERFORMANCE INDICATOR DEFINITION

More Related