DESCRIPTION

XST Synthesis. FPGA Design Workshop. Objectives. After completing this module, you will be able to…. List the synthesis options for XST Describe how to insert code from the Language Template Specify various methods for entering constraints. Outline. Introduction XST Synthesis

1 / 49

Télécharger la présentation

XST Synthesis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. XST Synthesis FPGA Design Workshop

  2. Objectives After completing this module, you will be able to… • List the synthesis options for XST • Describe how to insert code from the Language Template • Specify various methods for entering constraints For Academic Use Only

  3. Outline • Introduction • XST Synthesis • Templates and Libraries • XST Constraints Entry • Design Constraints • Timing Constraints • XST Report File • Summary • Lab 2: XST Synthesis For Academic Use Only

  4. Xilinx Design Process • Step1: Design • Two design entry methods: HDL(Verilog or VHDL) or schematic drawings • Step 2: Synthesize to create Netlist • Translates V, VHD, SCH files into an industry standard format EDIF file • Step 3: Implement design (netlist) • Translate, Map, Place & Route • Step 4: Configure FPGA • Download BIT file into FPGA HDL code Schematic Synthesize Netlist Implement BIT File For Academic Use Only

  5. XST Features • RAM inferencing • Schematic viewer • Error navigation • Timing-driven synthesis • Fanout control • Note: Mixed language designs are not supported For Academic Use Only

  6. Outline • Introduction • XST Synthesis • Templates and Libraries • XST Constraints Entry • Design Constraints • Timing Constraints • Log Reports • Summary • Lab 3: XST Synthesis For Academic Use Only

  7. XST Synthesis in Project Navigator • Module/entity selected in Sources window treated as “top” • XST-specific processes • Synthesize • View Synthesis Report • Analyze Hierarchy • Check Syntax • XST-specific properties • Synthesis Options • HDL Options • Xilinx Specific Options AM2910 as top-level For Academic Use Only

  8. FPGAs Virtex Virtex-E Virtex-II Virtex-II Pro Spartan-II Spartan-IIE CPLDs XC9500 XC9500XL XC9500XV CoolRunner CoolRunner-II Device Support XST provides technology specific optimization for: For Academic Use Only

  9. XST Flow VHDL Verilog Constraints Synthesis Technology Specific Optimization To Implementation Tools Synthesis Report File .NGC .LOG For Academic Use Only

  10. Main Synthesis Steps HDL HDL ParsingIdentification of language syntax errors HDL SynthesisMacro recognition, FSM extraction,resource sharing Low Level OptimizationMacro implementation, timing optimization,LUT mapping, register replication .NGC .LOG For Academic Use Only

  11. Macro Inference • Macro inference consists of two main steps: • Recognition (HDL synthesis level): XST tries to recognize as many macros as possible • Implementation (low level optimization): XST makes technology dependent choices • Improve design performance and decrease area • Preserve the macro as a macro? • Merge the macro with surrounded logic? • Choices depends on the macro type and size • If XST decides to preserve the macro, you must decide the way the macro is to be implemented For Academic Use Only

  12. Macro Inference Supported Macros Sequential Combinatorial Special Cases • Black boxes • Primitives • Arithmetic • Adders • Subtractors • Adder/subtractors • Comparators • Multipliers • Dividers • Multiplexers • Decoders • Priority encoders • Logical shifters • Three states • Registers • Latches • Counters • Accumulators • Shift registers • RAMs • ROMS • FSMs • Reg. multipliers For Academic Use Only

  13. FSM Recognition • XST is able to recognize state machines independent of the modeling style used • For example, you may have several processes (one, two, or three) in your description, depending on how you consider and decompose • Notes • XST can handle/recognize synchronous state machines • Currently, XST requires FSM with initialization signals, which can be asynchronous or synchronous For Academic Use Only

  14. FSM Optimization • Optimization is based on: • State assignment • Flip-flop (FF) type selection • State assignment - XST supports: • One-Hot - speed optimization • Compact - area optimization (Xilinx proprietary) • Gray - minimizes hazards and glitches • Also Johnson, Sequential, User Defined • User Encoding - XST will use the original encoding specified in the HDL file • If you use enumerated type for your state registers, you can use the “enum_encoding” constraint to assign a specific binary value to each state For Academic Use Only

  15. ISE GUI • Synthesis options • Global synthesis and optimization goal and effort • HDL options • Family-specific inference and optimization options • Xilinx Specific options • Specific low-level implementation and optimization algorithms For Academic Use Only

  16. XST: Synthesis Options • Set global synthesis, optimization goal, and effort • Optimization Goal (speed/area) • Optimization Effort (normal/high) • Synthesis Constraints File • Any text file • Use Synthesis Constraints File • Global Optimization Goal • Generate RTL Schematic • Write Timing Constraints • Verilog 2001 For Academic Use Only

  17. XST: HDL Options • Set family-specific inference and optimization options • FSM Encoding Algorithm • RAM/ROM/Multiplexer Extraction • RAM/Multiplexer Style • Decoder/Priority Encoder Extraction • Shift Register/Logical Shifter Extraction • XOR Collapsing • Resource Sharing • Complex Clock Enable Extraction For Academic Use Only

  18. XST: Xilinx-Specific Options • Set specific low-level implementation and optimization algorithms • Add I/O Buffers • Maximum Fanout • Equivalent Register Removal • Register Balancing • Move First/Last Flip-Flop Stage • Slice Packing • Pack I/O Registers into IOBs For Academic Use Only

  19. Outline • Introduction • XST Synthesis • Templates and Libraries • XST Constraints Entry • Design Constraints • Timing Constraints • XST Report File • Summary • Lab 3: XST Synthesis For Academic Use Only

  20. Language Templates • Two methods to open templates: • Language Icon • Edit -> Language Templates • Language Templates provide common templates for designs: • Component instantiation • Language templates • Synthesis templates For Academic Use Only

  21. Language Templates • To use template, be sure that an HDL source file is already opened • Place cursor at the location for the code to be entered • In the Language Template GUI, right-click on the template you wish to use • Select “Use in…” • Be sure the appropriate file name is listed For Academic Use Only

  22. HDL Libraries • Create VHDL Library using New Source Wizard • HDL Libraries Displayed in Libraries Tab of Sources Window For Academic Use Only

  23. Outline • Introduction • XST Synthesis • Templates and Libraries • XST Constraints Entry • Design Constraints • Timing Constraints • XST Report File • Summary • Lab 3: XST Synthesis For Academic Use Only

  24. What are Constraints? • Writing constraints is a method of communicating your design and performance objectives to the synthesis tools and implementation tools For Academic Use Only

  25. Xilinx Design Process • Step1: Design • Two design entry methods: HDL(Verilog or VHDL) or schematic drawings • Step 2: Synthesize to create Netlist • Translates V, VHD, SCH files into an industry standard format EDIF file • Step 3: Implement design (netlist) • Translate, Map, Place & Route • Step 4: Configure FPGA • Download BIT file into FPGA HDL code Schematic Synthesize Synthesis CONSTRAINTS Netlist Implementation CONSTRAINTS Implement BIT File For Academic Use Only

  26. XST Constraints • XST will accept synthesis constraints through the Xilinx Constraints File (XCF) • Do not confuse this with the User Constraints File (UCF), which contains implementation constraints for the Xilinx tools • When using an XCF file, specify the file in the Synthesis Options tab For Academic Use Only

  27. XST Constraints • To quickly enable or disable the use of a constraint file by XST, you can check or uncheck the Use Synthesis Constraint File menu -uc -iuc For Academic Use Only

  28. Constraint Types • Constraints in the XCF file can be divided into two groups: • Timing • Non-timing • For all non-timing constraints, the MODEL or BEGIN MODEL...END constructs must be used • This is true for pure XST constraints, such as FSM_EXTRACT or RAM_STYLE, as well as for implementation constraints, such as RLOC or KEEP • For timing constraints, such as PERIOD, OFFSET, TNM_NET, TIMEGRP, TIG, FROM-TO, etc., XST supports native UCF syntax, including the use of wildcards and hierarchical names • Do not use these constraints inside the BEGIN MODEL... END construct because XST will issue an error For Academic Use Only

  29. XCF - MODEL • To apply a constraint to the entire entity or module, use the following syntax: MODEL entity_name constraint_name = constraint_value; Note: If a constraint is applied to an entity or module, the constraint will be applied to each instance of the entity/module • To apply constraints to specific instances or signalswithin an entity or module, use the INST or NET keywords: BEGIN MODEL entity_name INST instance_name constraint_name = constraint_value; NET signal_name constraint_name = constraint_value; END; For Academic Use Only

  30. Sample FPGA Constraints/Attributes • allclocknets • period • max_delay • mux_style • ram_style • maxfanout • register_duplication • keep_hierarchy • For more information on attribute syntax, consult the XST User’s Guide For Academic Use Only

  31. Outline • Introduction • XST Synthesis • Templates and Libraries • XST Constraint Entry • Design Constraints • Timing Constraints • XST Report File • Summary • Lab 3: XST Synthesis For Academic Use Only

  32. FF3 FF1 FOE FF3 F0E3 FF1 F0E1 Design Constraints • If XST decides to push flip-flops to IOBs, then the following cases are taken into account • Flip -flops controlling OBUFTs will be replicated For Academic Use Only

  33. reg reg reg reg reg Design Constraints • Flip-flops having feedback will be replicated A RES CLK A CLK RES IOB=TRUE For Academic Use Only

  34. Design Constraints • If the output flip-flop belongs to a shift register and represents its last stage, then it will be pushed to an IOB • Note: XST will not reduce the number of stages in SRL and infer additional flip-flops in order to improve the clock-to-out of the slice • Example: If the user has described a 16-bit shift register, then: RESULT Generated by XST SLICE IOB=TRUE SLICE SI SRL 14 bit RES IOB=TRUE reg reg SI SRL 15 bit RES reg CLK CLK For Academic Use Only

  35. Outline • Introduction • XST Synthesis • Templates and Libraries • XST Constraints Entry • Design Constraints • Timing Constraints • XST Report File • Summary • Lab 3: XST Synthesis For Academic Use Only

  36. Allclocknets Period Offset_in_Before Offset_out_After FF FF logic logic IPAD OPAD IPAD logic Inpad_to_Outpad OPAD IPAD How XST Identifies Critical Paths During Timing Optimization • Notes • Other synthesis tools apply frequency specification to all four regions • ALLCLOCKNETS (the default constraint for timing optimization) in XST represents only clock-to-clock regions • MAX_DELAY is the constraint incorporating all four regions. For Academic Use Only

  37. How XST Identifies Critical Paths During Timing Optimization • The identification of a critical path depends on the timing constraints and is based on the slack calculation • The value of the slack depends on the way the constraints are applied • As soon as all of the slacks are identified, XST will choose the smallest (most negative) one in order to identify the Critical Region • Let us consider the following example For Academic Use Only

  38. How XST Identifies Critical Paths During Timing Optimization • Suppose we have two clocks (clk1, clk2) in the design. Before timing optimization their periods are estimated as: • clk1 : 30 ns • clk2 : 25 ns • If no value is supplied with the ALLCLOCKNETS constraint, XST will calculate the slack assuming the goal delay is 0 ns: • clk1 : -30 ns • clk2 : -25 ns • As a consequence,clk1 will be considered the critical one and XST will try to optimize this clock first For Academic Use Only

  39. How XST identifies Critical Paths During Timing Optimization • Suppose a PERIOD constraint defines individual timing requirement for each clock: 25 ns for clk1, 15 ns for clk2. In this case the slack will be: • clk1 : -5 ns • clk2 : -10 ns • As a result, clk2 will be considered the critical one, and XST will try to optimize this clock first • The ultimate goal, in both cases, is to increase the slack of all paths within the Critical Region. However, the final results of optimization are directly affected by the types and values of the constraints applied For Academic Use Only

  40. Outline • Introduction • XST Synthesis • Templates and Libraries • XST Constraints Entry • Design Constraints • Timing Constraints • XST Report File • Summary • Lab 3: XST Synthesis For Academic Use Only

  41. Understanding the Log File • The log file can be divided into three main parts: HDL Compilation HDL Analysis Table of synthesis options HDL Synthesis Messages generated duringsynthesis Low LevelSynthesis Final report General Statistic Table Timing Report For Academic Use Only

  42. Log File Organization TABLE OF CONTENTS 1) Synthesis Options Summary 2) HDL Compilation 3) HDL Analysis 4) HDL Synthesis 4.1) HDL Synthesis Report 5) Low Level Synthesis 6) Final Report 6.1) Device utilization summary 6.2) TIMING REPORT . . . ========================================================================= * HDL Compilation * ========================================================================= Compiling vhdl file constant.vhd in Library my_lib. . . . ========================================================================= * HDL Synthesis * ========================================================================= Synthesizing Unit <led_dec>. . . . For Academic Use Only

  43. Messages During Synthesis • The structure of this part directly reflects the main steps of the synthesis • Lists files used during • synthesis • Syntax check Warnings • and Errors HDL Compilation ... HDL Analysis • Information on extracted • macros and FSMs for • each hierarchical block • Summary Table on extracted macros for the entire design • Encoding style chosen for each FSM Messages generatedduring synthesis HDL Synthesis Low LevelSynthesis ... • Information on register • replication and removal For Academic Use Only

  44. Final Report ... Messages generated during synthesis GeneralStatistic Table Final Report Timing Report (FPGA only) For Academic Use Only

  45. Timing Report • XST is trying to keep its post-synthesis timing report close to the report generated by TRACE • Moreover, we have added a new table at the beginning of the report summarizing clock information of the design • List of all clocks in the design • How each clock is bufferized • How many loads each clock has For Academic Use Only

  46. Outline • Introduction • XST Synthesis • Templates and Libraries • XST Constraints Entry • Design Constraints • Timing Constraints • XST Report File • Summary • Lab 3: XST Synthesis For Academic Use Only

  47. Summary • XST is provided with v5.2i ISE software • XST provides various options for synthesizing designs • Language Templates allow you to re-use commonly used code • Several methods for entering constraints For Academic Use Only

  48. Outline • Introduction • XST Synthesis • Templates and Libraries • XST Constraints Entry • Design Constraints • Timing Constraints • XST Report File • Summary • Lab 3: XST Synthesis For Academic Use Only

  49. Lab 3: XST Synthesis Synthesize a verilog design using XST View the report file Take a snapshot Change synthesis options Add constraints to design View timing results For Academic Use Only