Ch5 Control Charts for Variables

Ch5 Control Charts for Variables. C.C. for process average ( mean quality ):. C.C. for process variability ( dispersion ):. ( 更一般化 ). S chart ; R chart. Variable : numerical measurement A single measurable quality characteristic, such as a

lydie
Télécharger la présentation

Ch5 Control Charts for Variables

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ch5 Control Charts for Variables • C.C. for process average(mean quality): • C.C. for process variability(dispersion): (更一般化). S chart;R chart • Variable:numerical measurement • A single measurable quality characteristic, such as a • dimension, weight, or volume, is called a variable.

  2. Process mean及Process variability必須同時control. • (a) Mean and standard deviation at nomial levels.

  3. Process mean is out of control: High fraction of nonconforming product. High process fill out. • Process variability is out of control:

  4. 假設quality characteristic is normally distributed with • mean and standard deviation . If is a sample • of sizen, then the average of this sample is Statistical Basis of the Charts 當X 不是Normal,但n 夠大時,上述之C.L.亦可使用。

  5. Center line • 若 與 未知時 其中 每一個都是average of n obs. is called the 從Range估計 Range of (sample of size n) (sample size n 的函數,查 (適用於 ) 其中 relative range. App. VI)

  6. 與 的相對效率 n Relative Efficiency 2 3 4 5 6 10 1.000 0.992 0.975 0.955 0.930 0.850 For moderate value of n, say , the range loses efficiency rapidly, as it ignores all the information in the sample between and . 隨n增大而遞減 結論:exhibit in control.

  7. C.C. for process mean C.C. for process mean

  8. 為n的函數(查 • 中央線 再以 估 C.C. for range 其中 R chart的建法 App. VI)

  9. 。Process variability  in control 。Process mean  in control 結論:Since both and R charts exhibit control, we would conclude that the process is in control at the stated levels and adopt the trial control limits for use in on-line statistical process control. Example 1: 25個samples,每個n=5(見附表) (見附圖) (見附圖)

  10. Specification Process capability的基本定義 Estimating Process Capability 如何評估製造過程的Capability(能力) • 假設活塞環的specification limits是74 ±0.05mm, • 則在上述例子中製造不良活塞環的比率為 • PCR(process capability ratio):另一個評估capability的指標

  11. 一般 為未知,以 估計,上述中 或計算 此process的natural tolerance limits佔據 specification band的60% 表示此製造過程的natural tolerance limits是完全落在 USL及LSL之間。

  12. PCR = 1 若在normal假設下,則此process製造出不良品的比率 為0.27%,即2700PPM。 • PCR > 1

  13. PCR < 1 大量的不良品被製造。

  14. Revision of Control Limits and Center Lines (定期的修正C.L.及Center Lines) 例如:每週、每月或每25、50或100個樣本。 • 若R chart顯示in control且process mean僅受單純的variable控制,則可將center line調到target value,但若process mean是被更複雜的variables所控制,則不適宜做此調整。 • 若R chart顯示out of control,則eliminate那些點再重新計算center line和control limit。

  15. 活塞環的製造,繼續使用 及R chart. • 如下表及附圖。 • 同時可使用tolerance chart(或稱tier diagram)。 • 當n≧7 or 8時,則可使用Box plot.

  16. CL 、SL及NTL: CL 與SL兩者之間不存在任何數學關係。 • CL是由process的natural variability(即NTL)所決定。 • SP則是由management、engineer、customers…決定 • (即過程外的因素所決定)。 • Control chart使用CL。 • Tolerance chart可用specification limits。

  17. 及R chart rational subgroup的選法 1. 對 chart而言  監測process meanbetween sample Sample 1 Sample 2 … Maximize the chance for shifts in 錯誤的估計法!將使S變得太大 且combines了between及within sample的variability. 2. 對R chart而言  監測process variabilitywithin sample 使得variability within samples只測量chance 或random causes

  18. 樣本大小 CL的寬度 取樣的頻率 設計C.C.的準則 • CC的統計性質 • 經濟的考量:cost of sampling, costs of investigating • and possibly correcting the process in response to out • of control signals, costs associated with producing a • product that does not meet specifications.

  19. chart若要detect中、大的shift,則n=4、5, • 若要detect小的shift,則n=15、25。 • R chart在n小時,對shift相當insensitive。 • (e.g. n=5,則detect從 到的機率僅有0.4。) • 但n大時(n≧10),則不宜採用R chart,應採用S或 • chart。 • small n 可避免shift發生在一個sample之中。

  20. CL通常取 ,若Type I error甚嚴重,可改採 ,或需 • 在短時間內detect出out of control,則可採用 。 • 取樣頻率:small, frequent or larger samples less frequently, • 目前工業界較偏向於small, frequent的取樣法。 • 取樣頻率可由rate of production決定。

  21. 及R chart中n為變數時 • 採用 及S chart(∵R chart的center亦隨時改變)。 • 從某一個時間後開始改變sample size從 。 new

  22. 但 與 皆是估計 ,∴若 沒改變

  23. new

  24. :n↓,CL的寬度↑ :n↓,center line↓及UCL↓ Example 2:活塞環的製造 由於process exhibits good control (見附圖) (見附圖)

  25. Probability Limits on the and R Chart • chart(Normal假設下): • e.g. 2. R chart:由 的percentage points決定。 e.g. If , the 0.001 and 0.999 percentage points of the distribution of the relative range W are required. Noting these points by and 當3≦n≦6,有正的LCL (即由檢定的Type I level所決定的control limit:UK或西歐國家)

  26. Charts Based on Standard Values 其中

  27. In processes where the mean of the quality • characteristic is controlled by adjustments • to the machine, standard or target values of • are sometimes helpful in achieving • management goals with respect to process • performance. • 使用標準值時,需注意out of control的意義!

  28. Interpretation of and R charts • 在解釋 chart上的pattern前,需先檢測R chart是否 • in control?先消去R chart中的assignable causes,再 • 來看 chart. 可能原因: chart:溫度、工作疲乏、 人員或機器輪流、 電壓變動… R chart:maintenance schedules、工作疲乏、工具磨損… e.g.金屬容盤的容量具有systematic的variability,是由於在 filling machine中的compressor開關的週期所造成。 Case 1 Cycles

  29. Case 2 Mixture pattern 可能原因: 是由兩個有overlapping 的分佈來製造此過程的 成品,overlap愈少,此 現象就愈明顯。有時是由於overcontrol所造成。 Case 3 Shift in process level 可能原因: 新進人員、新方法、新 原料、新機器、採用新 的檢測法或標準,改變 skill、目標、或員工的motivations。

  30. 可能原因: CL計算錯誤或是 太大,即每次取樣是由數個population 取出,亦即 是測量between population的variability,而不 是within population的variability。 Case 4 Trend 可能原因: tool的持續惡化,operator fatigue、presence of supervisor(或其他的 critical process component)、或分開或合併化學製造過程 中混合物的元素或溫度…(迴歸的控制圖)。 Case 5 Stratification (點不自然的集中在中央 線附近,lack of natural variability!)

  31. The effect of nonnormality on and R charts • 在Normal的假設下, 與R chart互相獨立,若否,則 • 表示Normality的假設不適合,即分佈可能是skewed! • 當品質的特性的underlying分佈可由過去收集的大量資 • 料來統計,則可藉此計算其probability limit,進而建立 • CC,但在大部份的情況,underlying的分佈是不可知, • 則我們想了解CC對normality假設的robustness性質。

  32. E.g. chart:uniform、 right triangular、 gamma( )n=4,5時 robustness 最差的情況:gamma(r=1/2,1(exponential)) (gamma ) R chart:即使當分佈是normal,R的分佈亦非對稱, 一般使用的 3-sigma limit,其 (當n=4),且R chart較 chart對normality的假設更 sensitive!

  33. In control value 當 已知時, chart的O.C. curve 當 的 The Operating-Characteristic Function (如附圖) (在第k個sample(after the shift)才detect出shift的機率) (此即為幾何分佈的期望值)

  34. In control value of the standard deviation 其中 ,查 的表 R chart的O.C. curve (如附圖) 利用O.C. curve來分析過去的資料,建議一般取20~25 subgroups來建立C.C. 。

  35. The Average Run Length for the Chart 皆為幾何分佈的期望值 (如附圖) Average Time to Signal:ATS=ARL.k Expected number of individual units sampled: I=nARL (如附圖)

  36. 1. The sample size n is moderately large, say n>10 or 12. (Recall that the range method for estimating loses statistical efficiency for moderate to large samples.) Control charts for and S 使用 及S charts。 當 2. The sample size n is variable.

  37. 是 的unbiased estimator Construction and Operation of and S Charts S並非 的不偏估計量,但 , 其中

  38. 當standard value is given S chart 當 是未知,則以 ,估計 S chart

  39. chart 注意: 若取 , 則相對的 均隨著改變, 並改以 的符號來代表。

  40. Example 3 活塞環的內半徑(如下表)

  41. 與先前的 相似(如下圖) 與由 估計的值相近

  42. The and S Control Charts with Variable Sample Size chart 當n是個變數時 其中 將由individual subgroup來決定 S chart

  43. Example 4 活塞環內半徑n=3~n=5(如下表)

  44. chart S chart 對第二個sample,n=3時, 的值亦隨之改變。 對第一個sample,n=5的C.L. (如附表與附圖)

  45. 當n是變數時,另一個可行的方法是採用 • average sample size • (適用於 變化不大時或展示給 manager看時) • 亦利用最常出現的 值來估計 的值。 • e.g.在Example 4中, 共有17 個,為最常出現的 • 值,則 • used is for samples of size n=5.

  46. The Control Chart (recommended by some practitioners)

  47. 若無法給定standards,通常以20~25preliminary samples • 的資料來建立trial control limits,但m=20~25對某些過 • 程而言卻太大(如start up process)。若m(即sample數) • 取得太小,則造成 變大。 e.g. chart中, 即使當m=25時,亦比nominal value大。 解決方法為:Hillier(1969)Two stage approach 來建立C.L. for and R charts.使得不論m之值為何, 皆可有正確的 值可應用於 job-shop or short production run。 Control Limits Base on a Small Number of Samples (Short Production Runs)

  48. Control Charts for Individual Measurements • 當n=1的例子 • 1. 自動化偵測每個產品。 • 2. 生產速度甚慢,不便取n>1。 • 3. 重覆測量的差異僅是由實驗或分析的錯誤所產生, • (e.g. 化學過程),即重覆測量是不需要的。 • 4. 例如在一捲紙中塗料的厚度,幾乎是處處相同, • 重覆取樣是不需要的,其所得的std. dev.亦會太小。

  49. 可利用相鄰觀測值的moving range來估計process的 • variability,即 • 當要detect的shift很小時,則可採用Ch 7的cumulative • sum及exponential weighted moving-average C.C. 。

  50. Example 5 • 飛機底漆的黏性是 • 一個重要的品質。 • 數個小時才能生產 • 一個batch的油漆, • 因此每次取樣僅能 • 取一個batch。