1 / 5

AGS/Booster Status

Haixin Huang. June 4, 2013 Time Meeting. AGS/Booster Status. Status. Continue to provide polarized beam for RHIC operation. The low energy (5.86GeV) has been extracted to the W dump with intensity as high as 9*10 10 , ready for APEX tomorrow.

onofre
Télécharger la présentation

AGS/Booster Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Haixin Huang June 4, 2013 Time Meeting AGS/Booster Status

  2. Status • Continue to provide polarized beam for RHIC operation. • The low energy (5.86GeV) has been extracted to the W dump with intensity as high as 9*1010, ready for APEX tomorrow. • Down ramp development: we have beam decellerated to injection with 1.4*1011, but some beam is lost on the ramp. The vertical tune near injectionon the down ramp still need to be tuned. • Another set of tune jump timing was derived. Statistically, there is no difference from currently used timing function. • New type of AGS IPM (eIPM) continues. Haixin Huang

  3. AGS Polarization for RHIC 70 Average of last one week is 72%. The asymmetry from 90 deg. detectors fluctuated a lot, probably due to extensive uses. Haixin Huang

  4. Low Energy Proton Setup is Ready 1. The low energy (5.86GeV) proton is ready. 2. The intensity of 9*1010 has been reached at W-dump, more than what is required for the APEX (5*1010) .  3. Only one G10 module is timed in the right window for this low energy. Key people for the work: Keith for the AGS setup; Kevin, Freddy and Tom for RF; Vincent and Greg for the AtR setup. Haixin Huang

  5. AGS Down Ramp Development It will be used for polarization and emittance measurements. Keith got beam survived down to injection, after Freddy’s transition code change. Haixin Huang

More Related