6 th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe

luke-ware avatar
12 diapositives · 344 Views · Oct 26, 2014

6 th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe. Table of contents. Introduction. The Powers of the Minister of Energy. Total responsibility for the energy industry Policy development Plan for new capacity Decide who to build new capacity

6 th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe - slide 1
01 / 126 th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe
1 / 17

Télécharger la présentation

6 th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. 6th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe

  2. Table of contents

  3. Introduction

  4. ThePowers of the Minister of Energy • Total responsibility for the energy industry • Policy development • Plan for new capacity • Decide who to build new capacity • Procure new capacity

  5. Key policy considerations • Ensure energy security of supply through: • Introducing Independent Power Producers • Cleaner technologies • Least cost technologies • Support regional integration and development

  6. IRP Revised Balance Scenario

  7. Integrated Resource Plan Implementaton First Determination Second Determination 1. Built, owned & operated by IPPs 2. Commitment necessary due to required high-voltage infrastructure, which has long lead time 3. Commitment necessary due to required gas infrastructure, which has long lead time 4. Possibly required grid upgrade has long lead time and thus makes commitment to power capacity necessary

  8. First Determination MW to be procured 1st Determination – 3724 MW of renewable energy of which over 2400 has be procured The department and Eskom signed contracts with 47 preferred bidders Some projects under window 1 are already supplying power into the grid whilst majority are due for connection in 2014 Most window 2 project are under construction and are due for connection into the grid in 2016 - 2017

  9. Second Determination 19 December 2012 Determinations Determination – 3200 MW of renewable energy Added to the current Renewable Procurement Programme Determination – Base load/ mid-merit - 2500 MW of coal based load/ import hydro - 2652 MW of gas fired plant mead married Separate procurement documents being developed Determination – Medium Term Risk Mitigation - 800 MW from cogeneration - 475 MW from gas of coal base load Separate procurement documents developed

  10. Eskom’s Africa Strategy To increase imports through supporting the RSA Department of Energy 1 Support the development of strategic transmission corridor and generation projects 2 To be involved in Operations and Maintenance (O&M) 3 In future to export surplus power 4

  11. Opportunity for Zimbabwe To develop interconnectors with: 1 Zambia Botswana Mozambique RSA Namibia To participate in future Procurement Programmes 2

  12. Thank You