An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Systems Engineering Beyond NASA Systems Engineering Applications in Houston Energy Industries

  2. Goal • Translate NASA Systems Engineering into terms understandable in the Houston Energy Industry • Broaden perspective of Systems Engineering beyond NASA • Facilitate long term build up of NASA Systems Engineering by understanding terms and identifying the right resources to bring on board

  3. About Philip • 12 years of engineering projects at NASA • 6 years as a PE/PM for ISS CHeCS health/medical hardware with Wyle Labs • 6 years SE&I for Constellation EVA with ESCG • Trade studies/analyses, requirements, verifications • 4 months unemployment • Interviewed and hired on as a Cost Estimator for Centurion Pipeline subsidiary of Occidental Petroleum • Actually working PMO project management process improvement

  4. Disclaimer • “Expertise” comes from career transition efforts and 3 months industry experience

  5. Technical Overview

  6. Systems of Interest Midstream Downstream Upstream

  7. Upstream • Involved in removing oil from the ground/ocean • Drilling, extracting • Projects include: • Product/Technology Development • Horizontal Directional Drilling • Hydraulic Fracturing “Fracking” • “Christmas Trees” • Pumps, valves, control systems • Building new systems for oil production • “Capital Projects” • Upgrade/improvement/maintenance of existing facilities • “Operations Projects” • Houston companies • FMC Technologies, Halliburton, Technip, Occidental, Shell, Chevron, etc.

  8. Midstream • Moving oil/gas from drilling sites to production/refineries • Pipeline companies • Trucking/train transport • Less engineering, more transport/logistics • Projects: • Less technical, more land and legal – broader big picture to integrate the system • Build upof new facilities/capabilities – “Capital” • Improvement of pipeline infrastructure – “Operations” • Houston companies: • Centurion Pipeline, Kinder Morgan, Spectra Energy, Plains All American, Magellan

  9. Downstream • Chemical and petroleum refining • Projects include: • High-pressure “turn-around” or “shut down” projects • Time is money, project must be very well understood and choreographed • Development of modular refinery equipment - Ventech • Capital and operational projects • Typically the Houston ship channel refineries in Pasadena, Texas City, etc. • Lyondell Bassell, Dow Chemical, Valero, Marathon

  10. Organizational Overview

  11. Project Life Cycle NASA/GOV’T Start Project CONTRACTOR NASA AEROSPACE Requirements Verification and Acceptance Design Fabrication Feasibility and Scope EPC, HARDWARE/SERVICE PROVIDER OWNER/OPERATOR Start Project OIL/GAS/CHEMICAL Scope, Requirements, Design Commission and Handover to Operations Construction Feasibility, Scope, and Cost Estimating

  12. Owner Operator • Similar to NASA-gov’t role as “customer” to contactor work force • Big names like Exxon, BP, Chevron, Shell, etc. • Provides the business case/rationale for a project • Systems Engineering roles: • Develop business case into a technical project scope • Assess feasibility and trade-offs of project • Part of “FEED” – Front End Engineering Development

  13. EPC’s • Engineering, Procurement, and Construction • Engineering support contractors • Utilized in all sectors of oil/gas/chemical • Picks up at Project Start • Continued FEED effort of requirements/design development • Oversight of construction through commissioning • Typically Project Manager/Project Engineer roles • Employers: S&B Engineering, Jacobs, Worley-Parsons, Bechtel, Mustang

  14. Products/Service Providers • They may follow their own product development life cycle • May also integrate with life cycle of EPC and/or Owner/Operator • Companies like FMC Technologies, Halliburton, Ventech, GE

  15. Roles/Responsibilities

  16. Terminology Difference • NASA Systems Engineering – Cradle to Grave technical project development life cycle • Systems Engineer in oil/gas – the engineer who is a specialist in a certain type of petroleum production system • Typically an 15-20 year engineer • Not typical for a NASA systems engr to transition into this role • FEED – Front-end engineering development • The conceptual, requirements, and early design phase of a project • Common terminology in oil/gas/chemical

  17. Project Engineer • NASA systems engineer = project engineer • Technical leadership/coordination of a project • 5-15 years engineering experience • Also known as: • Reservoir engineer – upstream drilling projects • Improvement engineer – downstream facility upgrade projects • Facility engineer – treats a facility as a project, slightly different than NASA facility engineer

  18. Project Manager • NASA systems engineering + cost/schedule/administrative duties • Typically more experienced 10-20 year engineers • Utilized in all sectors • Some very technical, others more managerial • Also called: • Product Managers • Project Coordinators – often a career predecessor to becoming a PM

  19. Safety, Environment, and Health • A subset of NASA-systems engineering, but a HUGE deal in oil/gas • Needs a grasp of the big picture of a project and how it impacts safety, environment, and health • Often a big enough task to warrant a dedicated engineering team to take on these tasks • Technical, diplomatic, and coordination-oriented

  20. Project Controls • The business end of Systems Engineering • Historically a job for “business majors” but some places are looking for more technical/systems acumen to be able to do “controls” related tasks • Tend to be hands-on, going out to facilities/job sites to interface with team members • Common Job Titles: • Project Scheduler • Cost Estimator • Cost Engineer

  21. Continuing Education • Project Management Institute (PMI): Project Management Professional (PMP) certification is HUGE! • Very similar in nature to CSEP • Six Sigma green/black belt also very marketable

  22. Wrap Up • Technical • Systems Engineering in Oil/Gas projects • Product/technology development • Well-orchestrated construction • Business • Owner Operator vs EPC • Different phases of SE&I life cycle • Similar dynamic to JSC community • Roles/responsibilities • Actual job titles with SE&I applications

  23. Wrap-Up • NASA systems engineering from an outside perspective • An opportunity to connect dots between NASA and industry

  24. Questions?